Architecture & Infrastructure

  1. Home
  2. Architecture & Infrastructure
Company profile
Architecture & Infrastructure
Services
Sustainability Practices
  • Focus on the circular economy in our designs, studies and company practices
  • Low carbon designs, i.e. use of solar panels, alternative energy generation techniques
  • Attention to passive cooling and reduce solar gains in design
  • Ensure designs are bicycle and/or pedestrian friendly as required and assist those
  • Waste saving techniques adopted
  • During execution supervision, sustainable principals strong emphasis on occupational safety, labour principles practiced
  • Environmental Impact Assessments / Environmental Construction Impact Assessments commissioned and followed and recommendations reflected in designs
BIM Experience

Old Doha Port

Location: Qatar

Scope: Conceptual and Detailed Design Drawings

Strategic Food Security Facilities

Location: Qatar

Scope: Detailed Design, Construction Support

Prince Hamad Visitor Centre

Location: Qatar

Scope: Conceptual and Detailed Design Drawings

Heritage / Resorts

Rijal Almaa, Deire’ and Three Ain Villages

Location: Rijal Almaa, Deire’ & Three Ain Villages, KSA

Scope: Master Plan & Design

Lagoon Hotel & Resort

Location: Jordan Valley

Scope: Design drawings and construction supervision

Levant Resort

Location: Jordan

Scope: Design & W.D

Infrastructure

Culture and Religious Centre

Location: Oman

Scope: Conceptual and Detailed Design Drawings

Arabian Palaces

Location: UAE

Scope: Conceptual and Detailed Design Drawings

Al Yarmouk Club

Location: Jordan

Scope: Conceptual and Detailed Design Drawings

King Abdul Aziz University

Location: KSA

Scope: Design and Tender Documents

Health Specialists Building

Location: KSA

Scope: Design and Tender Documents

Rotana Hotel

Location: KSA

Scope: Design and Tender Documents

ARAMEX Interior Design

Location: Jordan

Scope: Office Design and Fit-Out

Twin Towers

Location: Qatar

Scope: Detailed Design, MEP, BIM

Master Plan

Location:

Scope:

Industrial

SABIC Projects and Operations Framework Agreement

Operator: SABIC

Location: Saudi Arabia

Scope: Engineering and consultancy support services for all affiliates

YASREF Projects and Operations Framework Agreement

Operator: YASREF

Location: Saudi Arabia

Scope: Engineering and consultancy support services for all affiliates

Truck Loading Facility

Operator: Petro Rabigh Company

Location: KSA

Scope: Conceptual / FEED for a Petrochemical Product Truck Loading Facility

Case Study 1 - Hamad Port Facilities, Qatar
  • Focus on sustainable design, fully functional and efficient terminal and storage facility of edible bulk with continuous flow of commodities
  • Scope included Concept Design and Basis of Design / 3D Renderings / Sustainable Strategies / Safety / Connectivity / Safety In Design
  • Equipment Design includes MV Substations, Central Chilled Water Plant, Sewer System Design, ICT and Security, Data Networks and connectivity, HVAC systems, Fire Fighting, Compressed Air System
  • Ensuring safe operations, low carbon design and controlled emissions and waste management systems
  • Development of a smart and unique “Building Management System” (BMS) as a centralized control system monitoring all buildings/structures
  • Energy Conservation opportunities due to connectivity and lower CO2 emissions meeting sustainability philosophies
  • Sustainability strategy followed the Global Sustainability Assessment System developed by GORD (unique for Qatar) with a 2 star rating
  • Connectivity included Gateways, GPS, Ethernet Communication, SCADA, HMI systems were provided
Case Study 2 – Heritage Villages
  • Unique UNESCO orientated projects for Rijal Almaa, Deire’ and Thee Ain villages in Saudi Arabia
  • Sustainable and cultural heritage project to integrate historical buildings with tourists points
  • Focus on solar shading, shaded areas to allow passive cooling and reducing solar gains
  • Waste saving with a low carbon designs with the use of photovoltaic cells and motion detection energy saving systems
  • Traditional methods adopted for insulation using eco-friendly materials
  • Importance of natural light in line with historical practices
Case Study 3 - Hospital & Hotel Complex
  • King Abdulaziz University and Wadi Jeddah Company Hospital and Hotel complex
  • 300 Beds and 150 clinics Hospital with all required facilities for major surgery and medical specialists
  • 5* Hotel complex with 285 rooms and additional amenities of a sports club and ball room / event facility
  • Total plot area of 146,000m2 consisting of:
    • 3 Basement floors for parking and MEP facilities
    • 4 floors podium with Hospital and Hotel with 12 story
  • Sustainable Techniques adopted in design including:
    • Minimizing water consumption through benefitting from sea water for chiller systems
    • Low carbon design with the use of photovoltaic cells on façade and on roof space
    • Use of insulation systems to reduce HVAC energy consumption adopting
    • Importance of natural light throughout complex, with solar shading / shaded areas and passive cooling to reduce solar gains
    • Pedestrian / patient mobility techniques considered
Case Study 4 - Transportation Hub
  • Ministry of Transportation led project to improve traffic congestion and mobility within an urban area
  • Project intent was to significantly accessibility and efficiency of public transportation issues
  • Detailed Traffic Impact assessments and evaluations were conduction to develop efficient routes and paths for transport flow within the constraints of an existing transport system
  • Multiple locations were selected and focus on sustainability, improve societal values, reducing the cities carbon footprint by encouragement of public transport.
  • Use of solar energy generation techniques at all locations was encouraged for terminals and structure roofs
  • Electric vehicle were incorporated to operate encouraging energy transition
  • Smart technologies were incorporated for sound/light and tracking systems
  • Focus on mobility encouraged for special needs passengers
BIM Case Study 5 - Old Doha Port Project
  • Support was provided to main contractor for the development of the old Doha Port Project in Qatar
  • The engineering package scope including SC requirements were met
  • BIM was utilised to support the execution of the project
  • Generation of COBie and Asset Management Schedules were also utilised
Sustainability Environment, Social and Governances
  • BEC are committed to implemented sustainable techniques in relation to supporting Energy Transition, Minimizing Environmental Impacts, Growing societal values and ensuring safer operations in its design and execution strategies
  • During Technical Studies execution, BEC ensure to implement these principles, examples include the following:
    • Preventing uncontrolled release of emissions to the atmosphere by ensuring control measures are in place
    • Re-use of by-products from the process or activity
    • Use of alternative energy techniques
    • Localisation of material sourcing
    • Re-use of existing equipment planned for demolition
    • Water Management / Resource Management
    • Safe practices with procedures and guidance managed
  • Appropriate actions are suggested and agreed by the forum for closeouts
  • Recently launched Aramco Sustainability Report for 2021 sets out clear principles which BEC will implement in all projects and design.
Fast Track Construction
SCOPE REQUIREMENTS
  • Fast Track Construction
  • Modulization of construction Techniques
BEC RELEVANT EXPERIENCE
  • Significant experience gained as a PMC consultant to construction projects in Saudi Arabia has ensured schedule optimization through means such as:
    • Overlapping of key activities demonstrated during Plant Shutdown PMC activities
    • Coordination and incorporation of key activities required during short windows
    • As a design consultant, a focus on floating Material Requisitions as early in design as feasible for long lead item. This is demonstrated on the 50+ design projects BEC engaged in to be executed during a shutdown window which required timely arrival of long lead material
  • Experience has also been gains on pre-fabrication activities, modulization where possible considering challenging execution schedules. Again, these are common activities during facilities shutdown, which BEC has gained considerable experience