PDO |
HAZOP |
FCP 5298 Provide 2 line from Upstream of ESD 27-GB-031 in Yibal Gas export line |
PDO |
HAZOP |
JLSW 6"-65Km PL Scope_ Plan & CE with assumptions |
PDO |
HAZOP |
FCP 8820 Energy saving by de-staging of Deep-Water Disposal pumps P-2752A/B/C |
PDO |
DR/HAZOP |
62090 LEK20207201 Introduction of Flow transmitter low low |
PDO |
HAZOP |
MTU provision on wellhead Hazoped in earlier projects |
PDO |
DR |
PDC-N01185 and Nimr E Denser infill project_SPD220039 |
Geneire |
Engineering |
Structural Design _ Mutual Non Discoulse Agreement(NDA)- Geneir Management Consultancy |
MEC |
HAZOP/DR |
12010.00-10-04 for Combined DR HAZOP |
PDO |
HAZOP |
FCP 11189 Piping modifications to route gas from Solar compressors to Yibal Khuf |
PDO |
HAZOP |
JLSW project DR/HAZOP for CINSkid |
PDO |
HAZOP |
DR and HAZOP workshop for FCP 2811 Replace AMETEK interface level transmitters from Musallam station test separators |