MMP |
Worley |
RFP: 413014-00415-SC-9002 HAZOP & SIL Study - Install Water Wolf DOR Skid at UGOSP-13 (EWO-23B201) |
MMP |
KBR |
Upgrade Hydrobcacker Reactor Effluent System Riyadh Refinery |
MMP |
KENT |
5200002-06 - SO # PCD/OF/SO-01/24 - Re-FEED for Khafji Field Well SCADA – Phase 1 : Enquiry for HAZOP Study |
Mudassar |
PRC |
PRPMD-2024-0467 WER-R-24-30-40000-058-001-00 LCO Recycle Line From Tank Farm to VGOHT |
Mudassar |
PRC |
PRPMD-2024-0469 WER-R-24-30-40000-059-001-00 Processing of LN and C5-rich cut from Tank farm to Naphtha Merox |
MMP |
PDO |
52M12020: FCP-7660 Install sampling point in test separator in RMS 12 shimmer test separator |
MMP |
PDO |
67267 FCP-7400 DP across V-6903 ESD inlet valve 69-UZV-0151 |
MMP |
PDO |
MEC - 17127_FCP-11489 upgrade variable flow meter |
MMP |
PDO |
MEC - 17081_FCP-10554 Chande pig trap drains lines spectacle blinds position from closed to open |
MMP |
PDO |
MEC - 17081_FCP-10554 Change pig trap drains lines spectacle blinds position from closed to open |
MMP |
PDO |
MEC FCP-9798, 9632, 9635, 9633, 9800 CPP Retrospective HAZOP action close out |
MMP |
PDO |
OMEPC- 1212 / FCP-10057 Pipeline connection to MBK safety shower |
MMP |
PDO |
Amal dead leg elimination -FCP-10973 |
MMP |
PDO |
OMEPC: SNGP FCP-9524 EXPORT GAS QUALITY GHV |
MMP |
PDO |
MEC - 16040-FCP-7342 Y2DC Compressors auto drain |
MMP |
PDO |
Galfar - desktop review for Std oil/gas well head hookup |
MMP |
PDO |
OmECP/FCP-9352/Dhulaima WI HEADER ISOLATION VALVE ARRANGEMENT |
MMP |
PDO |
WMMF21125 / MMF202137 / FCP-16172 The change of existing RV to new ones in order to meet the new set point of the QATA manifold to 35 bar |
MMP |
PDO |
MEC_52M13072 FCP- 6858 Replace BCGS SOGL line USM/DR/HAZOP Workshop |
Salim |
Petro Rabigh |
Project Management consultancy (PMC) Contract for PRC Mega Projects PR#10111044 |