PMC |
Maaden |
Project Manager for Maaden |
PMC |
Maaden |
Requirement of Safety Engineer |
Engineering & Design |
PRC |
Route Light Naphtha From TF to CFU by S030-P0 - WER-P-039 |
Process Safety |
Khatib & Alami |
Request to contact Berkley to Update HAZOP Study |
Process Safety |
KBR-AMCDE |
W90-PHA Study-RFQ |
PMC |
PRC |
Provision of Support Services for General Engineering under Minor Section - Project Engineer - WER-P-057 |
PMC |
PRC |
Provision of Support Services for General Engineering under Porject Support Section - (1) Senior Secretary - WER-P-061 |
Process & Safety |
Muscat Engineering Consultancy |
52M13011.00 Save 10804T SteamYear, K2720 Motor - Design Review |
Process & Safety |
Muscat Engineering Consultancy |
52M13002 FCP 6870 Relocate Upgrade ALG SOGL flow meter - DR/HAZOP |
Process & Safety |
Muscat Engineering Consultancy |
52M13022 FCP 8820 Energy saving by de-staging of Deep-Water Disposal pumps P-2752ABC - DR/HAZOP |
Process & Safety |
Muscat Engineering Consultancy |
52M14006 YIB20207526 P-0986 loop oil RV is not registered in SAP CIMS - Design Review |
Process & Safety |
Muscat Engineering Consultancy |
52M14003 - YIB20208730 To change the spool size from 2 to 1 of T095125 BLANKET GAS CONTROL VV - Design Review |
Process & Safety |
Muscat Engineering Consultancy |
52M14008 UPS Supply for All 6.6 KV Motors - Design Review |
Process & Safety |
Muscat Engineering Consultancy |
63014 FCP 4487 Install 2 FLP Pressure Switches in BHN old ESP wells BHN - HAZOP |
Process & Safety |
Muscat Engineering Consultancy |
52M13010.00 12 900 - Buried- HRSGs Common drain header replacement - DR/HAZOP |
Process & Safety |
Muscat Engineering Consultancy |
52M13009 FCP 7857 9724 S-2505ABC suction strainers upgrade - DR/HAZOP |
Process & Safety |
PDO |
RFx 4000134174 11125-N2 PACKAGE HAZOP-OP38 |