Engineering |
PRC |
Catalyst Circulation Continuity - WER-P-032 |
Engineering |
PRC |
R260-AT-0005 SO2 Analyzer Upgrade - WER-P-033 |
PMC |
Maaden |
Civil Engineer |
Process & Safety |
Muscat Engineering Consultancy |
78129- DD for 48 Rich And Lean Gas Segregation Project |
Process & Safety |
KBR-AMCDE |
B-2021058 T289-SPARK - Follow Up Session |
Process & Safety |
Muscat Engineering Consultancy |
78129.00-10-02 Amendment 01 for DR Workshop 78129- DD for 48 Rich And Lean Gas
Segregation Project |
Process & Safety |
Muscat Engineering Consultancy |
1 day DR/HAZOP Workshop for 67249- FCP 7536 - To replace moisture analyzer in
KGP 62-QIZA-1061 |
PMC |
Maaden |
Project Manager for Maaden |
Process & Safety |
Muscat Engineering Consultancy |
1 day HAZOP Workshop for 61091 FCP FAH20219002 FHD.2010C 4in buried condensate
line in D station |
Engineering |
PRC |
Provision of Support Services for General Engineering under Project Support
Section - (1) Senior Secretary - WER-P-036 |
Process & Safety |
SGS |
SGS Early Production Facility |
Process & Safety |
Muscat Engineering Consultancy |
1 day HAZOP workshop under 67250 - FCP-7419 To replace HP flare KOD V6311 level
transmitter in SNGP |
Process & Safety |
Baraka Oman |
Hawqa Asfoor Water Injection Hazop |
Engineering |
PRC |
Steam Trap Installation U/S of DR-1465-E01 - WER-P-040 |
Process & Safety |
Worley |
Retro Hazop Workshop Plan for 2022 |
Process & Safety |
OMEPC |
DR/HAZOP - To Provide selection mode in DCS changeover between FG &
Nitrogetn for Flare Header (FCP-8932) - OMEPC-1168 - GGE-FCP-Gas20218932 |
Process & Safety |
Worley |
EPCC11125 - DR facilitation for Nitrogen Package |
Engineering |
PRC |
R260-AT-0004 Stack O2 Analyser Upgradation - WER-P-010 |
PMC |
Maaden |
Safety Engineer |
Process & Safety |
Maaden |
Change order for B-2021073 - Additional 1 day |
Engineering |
PRC |
Anti-Drone Fence barriers Installation - WER-P-051 |
Process & Safety |
Worley |
B-2021175 - EWPL / Vendor HAZOP IA & RB211 - Additional Day |
Engineering |
PRC |
Piping Material Upgrade for R41-CCR Loop - WER-P-042 |
Process & Safety |
Worley |
B-2022048: EPCC11125 - DR facilitation for Nitrogen Package - Additional Day
|
Engineering |
PRC |
QC Lab Ventilation System Modification - WER-P-052 |
PMC |
PRC |
Provision of Support Services for General Engineering (1) DCS Engineer under
Major Project Exeution Section/Lead Discipline Engineer - WER-P-055 |
Engineering |
PRC |
Route Light Naphtha From TF to CFU by S030-P0 - WER-P-039 |
Process & Safety |
Arabian Industries |
4000131246 - Facilitator for Design Review - PYP40000069 GGP -Flare Gas Recovery
Project |
Process & Safety |
Khatib & Alami |
Request to contact Berkley to Update HAZOP Study |
Engineering |
KBR-AMCDE |
W90-PHA Study-RFQ |
Process & Safety |
Muscat Engineering Consultancy |
63113- FCP QAR20184798 2 out of 3 Logic Implementation of Instrument Air |
PMC |
PRC |
Provision of Support Services for General Engineering under Minor Section -
Project Engineer - WER-P-057 |
Process & Safety |
Muscat Engineering Consultancy |
1 Day HAZOP for 61062 Natih Fuel Gas Skid |
Process & Safety |
Muscat Engineering Consultancy |
Project 14004 YIB20218979 AHSW water injection manifold pressure |
Process & Safety |
Muscat Engineering Consultancy |
Project 64071 YIB20196351 Test header segregation valves |
Process & Safety |
Muscat Engineering Consultancy |
67290 FCP-7752 Demolishing of 4 crossover from gas pipeline to 14 |
Process & Safety |
Muscat Engineering Consultancy |
67240 FCP-7433 14 condensate Barik to SRCPP preservation |
PMC |
PRC |
Provision of Support Services for General Engineering under Porject Support
Section - (1) Senior Secretary - WER-P-061 |
Process & Safety |
Muscat Engineering Consultancy |
52M13011.00 Save 10804T SteamYear, K2720 Motor - Design Review |
Process & Safety |
Muscat Engineering Consultancy |
52M13002 FCP 6870 Relocate Upgrade ALG SOGL flow meter - DR/HAZOP |
Process & Safety |
Muscat Engineering Consultancy |
52M13022 FCP 8820 Energy saving by de-staging of Deep-Water Disposal pumps
P-2752ABC - DR/HAZOP |
Process & Safety |
Muscat Engineering Consultancy |
52M14006 YIB20207526 P-0986 loop oil RV is not registered in SAP CIMS - Design
Review |
Process & Safety |
Muscat Engineering Consultancy |
52M14003 - YIB20208730 To change the spool size from 2 to 1 of T095125 BLANKET
GAS CONTROL VV - Design Review |
Process & Safety |
Muscat Engineering Consultancy |
52M14008 UPS Supply for All 6.6 KV Motors - Design Review |
Process & Safety |
Muscat Engineering Consultancy |
63014 FCP 4487 Install 2 FLP Pressure Switches in BHN old ESP wells BHN - HAZOP
|
Process & Safety |
Muscat Engineering Consultancy |
52M13010.00 12 900 - Buried- HRSGs Common drain header replacement - DR/HAZOP
|
Process & Safety |
Muscat Engineering Consultancy |
52M13009 FCP 7857 9724 S-2505ABC suction strainers upgrade - DR/HAZOP |
Process & Safety |
PDO |
RFx 4000134174 11125-N2 PACKAGE HAZOP-OP38 |
Process & Safety |
Muscat Engineering Consultancy |
DR/HAZOP for project 63134 FCP 5975 QAR20195975 K-4802 anti-surge valve
replacement |