MMP |
HAZOP |
HAZOP- GES-2023-0014 / eMOC 2939 / BEP for Change BuOH Storage Tanks Design to DFRT |
MMP |
HAZOP |
102416 - New Invitation SA_ EWO#23D044, Install New Parallel GART Gas Line Inside Fence Review in RTR (HAZOP) |
MMP |
HAZOP/SIL |
RFP for HAZOP & SIL - Residue Upgrade Project at Ras Tanura Refinery FEL-3 |
Fazal |
Engineering |
RFP-AESS-223 – Technical support 3C and stage 3D Document Review Services for F&B secondary all Disciplines Packages. |
MMP |
SIL |
Change order for B-2022587 [External] RE: Oily Water Sump (OWS) Scope; Subcontracts SOW - HAZOP & SIL |
MMP |
HAZOP/SIL |
BI-10-01095_ Upgrade Safety Integrity Level for Drainage Systems - Southern Area GOSPs: RFP for HAZOP & Sil Revalidation Study |
MMP |
HAZOP |
RFP-HZP-3771-0003 - HAZOP STUDY Scope / CER- 11-23000-3771 INSTALL NEW UTMN RH “I” AND TRUNKLINE TO UGP |
MMP |
HAZOP/SIL |
AMIRAL Package 5A & 5C - HAZOP & SIL/LOPA Study |
Fazal |
Engineering |
Qassim Project- BI-10-00983-004 RFQ for Engineering Services Procurement Support on ( MR , TBE , NMR ) |
Fazal |
Engineering |
Cable Crane Proposal |
MMP |
HAZOP |
HAZOP_ Facilitation_ PYP40000106_ RFX_ 4000175225_ DR/HAZOP Facilitator |
MMP |
HAZOP |
OMEPC-1207 - Retro HAZOP-Infra Assets-MAF Tank Farm&Terminal System |
MMP |
HAZOP |
Hanya Oil Recovery vessel V-29005 HH Level trip logic modification |
MMP |
DR |
RFX-4000177517- RFX-DR-FACILITATION // PQE40000160- PQE40000160-QAL-AG-BARKIK PSBR8 IPF Blowdown Project |
Salim |
Support |
PRPMD-2023-0600 WER-R-23-20-40000-278-001-00 “Provision of Support Services for General Engineering under Minor Project Execution Section - Project Engineer” |
MMP |
HAZOP |
RFX.4000178014- HAZOP Facilitator_ KAU GL Deployment- KAU GAS LIFT Deployment Project |
MMP |
HAZOP/DR |
Change MMPS Gross Export Flow Meter ( 28-FRC-51) type |
MMP |
HAZOP/DR |
FCP-8849-provision of Corrosion inhibiter skid for 16 THM to GGP |
MMP |
HAZOP/DR |
17050 : FCP-9927 To install new type of venture meter (Haimo) existing well in central asset - DR/HAZOP review |
MMP |
HAZOP/DR |
"NPS N2 package & MGI N2 package sharing same header & Nitrogen Piping Network |
MMP |
HAZOP/DR |
DR Readiness and AIPSM Workshop Attendance -FCP-10333 CPP and SNCP Off-spec Condensate Tanks' High Level IPF Upgrade |
MMP |
HAZOP/DR |
52M13047.00 - FCP 15075/-52M13051- FCP 11972/52M13050-FCP 12358combined DR & HAZOP workshop. 52M13050.00 - QAS PGC discharge lines drain pipes material upgrade. 52M13051.00 - FCP11972 HRSG F2620/2630/2640 Diverter Damper Seal Air Valve Logic Modification. |
MMP |
HAZOP/DR |
17135 - FCP-12350 Condensate flash vessel V-21093 filter installation_ Additional Day _Design Change |