MMP |
PHA/HAZOP /SIL |
PHA, HAZOP & SIL Study for the Saudi Aramco Marjan Project - New Gas Compression Platform. |
MMP |
RAM |
600136 - BI-10-13173, Install Diesel Product Water Removal Facility at RTR (RAM Study) |
MMP |
PHA |
PRELIMINARY HAZARDS ANALYSIS (PHA) Facilitator's CVs for MSSD SHOPS EXPANSION PROJECT (BI 10-20647), Project NO: (413014-00312)Saudi Aramco |
MMP |
SIL |
Change order for additiona Sifs ( B-2022044) |
MMP |
HAZOP |
HAZOP Facilitator Worley Turkey |
MMP |
HAZOP |
SAKARYA GAS FIELD DEVELOPMENT PHASE 2A – SIL/LOPA- (B-2023455- Hazop) |
MMP |
HAZOP |
17135 - Design Review - FCP-12350 Condensate flash vessel V-21093 filter installation PO 4800110959 |
MMP |
Hazop/DR |
"DR Facilitation- PLP40000132- RFX - 4000173562-PLP40000132 LPS New Water Transfer and Booster Pump Project |
|
MMP |
Hazop/DR |
67137 FCP-6061 To upgrade CPP off-gas compressor K-3512 stuffing Box - HAZOP workshop PO # 4800110959 |
MMP |
Hazop/DR |
OMEPC-1204 - FCP 8184,9570_ GGP FCPs &FCP 8330,8569_ KGP FCPs ( DR & Facilitator) PO# 4800110959. |
MMP |
Hazop/DR |
52M13042 FCP # 10578 HRSG F2620/2630/2640 Fuel Gas Supply Pressure LL Logic Modification_ Combined DR and HAZOP review PO 4800124212 |
MMP |
Hazop/DR |
52M17033 FCP 8818 To improve the reliability of offspec pump mechanical seal and avoid possibility Project PO 4800110959 9 cancelled due to PDO ( chargable) |
MMP |
Hazop/DR |
52M13045.00 Reroute the process drain of K-1120 gas boots drains_ Combined DR and HAZOP workshop PO 4800124212 |
MMP |
Hazop/DR |
52M11018 FCP9825 NAT S0603- FL12 AND NAT S0604- FL12 Water Duplex Filter -Desk top DESIGN Review |
MMP |
Hazop/DR |
FCP -62081 V-2641 Dual FSeparator Vessel : HAZOP PO 4800124212 |
MMP |
Hazop/DR |
FCP-10178-To add 1no. additional Pressure transmitters in instrument air Distribution Line 4800110959 |
MMP |
Hazop/DR |
TI-3439-CPP.89352W-Pin hole leak_ 4800123648 |
MMP |
Hazop/DR |
Design Review - FCP 9698- To install Temperature Transmitter to Anzoz, Sayyala, Suwaihat and Zauliyah Gas Plant Crude Export flow meter. |
MMP |
Hazop/DR |
Quotation No. 50000495997 GB FCP - Design Review/HAZOP 4800123648 |
MMP |
Hazop/DR |
"DR/HAzop for 52M17143 FCP-15138-Cut Over Modifications within SRCPP for SDO |
MMP |
Hazop/DR |
50000495997 BHA/1462 (IBF 12294) - Test separator HAZOP completed and WMNF20656 (MOV to be provided at FWKO inlet): DR Completed_ 4800123648 |
MMP |
Hazop/DR |
Quotation No. 50000495997: WMAF20720 - APO MOC upgrade (DR Completed). WMAF20719 (DR spilled over) |
MMP |
Hazop/DR |
Quotation No. 50000495997- IBF13173 & IBF14265_4800123648 |
MMP |
Hazop/DR |
OMEPC-1210 - FCP-9520-6701-Shuaibah Bulk Separator (DR) PO-4800110959. |
MMP |
HAZOP |
Quotation No. 50000495997 IGF13596- wireless conditioning monitoring system for critical equipment & IGF3599- water flushing connection to Alnoor crude stabilizer_4800123648 |
Fazal |
Engineering |
TRT-Oxagon for Service order # 001 |